Plan the job.
Track the permit.
Keep the record.
SiteLedger is a demo operations workspace for onsite-wastewater workflows. The Daniel's Construction public profile below is source-grounded; demo modules do not establish the company's current operating capabilities.
Leads, jobs, permits, and operational records in one workspace.
Reference SKUs, bills of material, and inventory concepts.
Illustrative intake-to-close workflow with permit checkpoints.
Daniel's Construction of CP, LLC
Daniel Wingate · 12006 Branch Hwy, Church Point, LA 70525 · Acadia Parish
Shown on the LDH active installer list, updated July 9, 2026. Recheck the LDH program page before permitting.
Open SiteLedger.Daniels-Construction →Demo catalog SKUs
Product-reference data in the software demo is not a claim about current Daniels operations.
Extended Aeration — 102″ Model (Daniel APPROVED)
Final approved 102″ aeration package: 1,569.66 gal / 25.11 h HRT, 750 gal trap, 570 gal clarifier, simplex 30 CFM @ 3.5 PSI, Sch 40 galv. Cost-optimized by Daniel Wingate 2026-08-06.
Extended Aeration — audit draft 78″ (superseded)
Earlier audit geometry (78″ aer / duplex / Sch 80). Superseded by ATU-1500-102.
Chlorine Contact Chamber
100-gallon 2-pass baffled contact — standardized (not 39 gal text). ~38.4 min detention at peak hourly for 1500 GPD plant.
Aerobic Treatment Unit (legacy PE geometry)
1,022.53 GPD as-drawn PE plant — keep for warranty/legacy only. Do not sell as 1,500 GPD.
Extended Aeration (original title block)
Original DW-1500 sheet family before audit corrections — superseded by ATU-1500-R.